The most recent updates are listed below. View the archive of all updates here.
Jan. 20, 2026
The temporary, single lane roundabout at the intersection of East Main St. and the relocated Horning Road is operational; East Main St. traffic is now reduced to two lanes from approximately Frances Dr. to the United Methodist Church. Overlook Dr. is now closed at East Main St. with access maintained for residents via Woodhill Dr.
A reminder to motorists traveling in the work area to please slow down, pay attention to the posted signs, and use caution when entering and exiting the temporary roundabout, especially during inclement weather conditions.
During the week of Jan. 26 Enbridge will begin work on the gas lines. The utility company has mailed out notices to customers in the affected area.
Questions about the East Main Street project can be directed to Jon Giaquinto in the City Engineering Division at Jon.Giaquinto@KentOhio.gov or 330-678-8106. You can also send your email address to Giaquinto if you would like to receive email updates.
Dec. 29, 2025
Kenmore Construction has been working on East Main St. during the cold weather and is planning to continue throughout the winter, identifying areas of underground utility work that can be done, such as sewer installation, water mains, and electrical conduits. The work zone is being adjusted to open more areas for the contractor to install utilities.
A temporary, single lane roundabout will be installed at the intersection of East Main St. and the relocated Horning Road (across from Overlook Dr.). Also, the three-lane section on East Main will be reduced to two lanes from approximately Frances Dr. to the United Methodist Church. This will allow more room for the contractor to build the center median.
The temporary roundabout is expected to be completed during the week of Jan. 5. When that happens, Overlook Dr. will be closed at East Main St. Access to Overlook Dr. will be maintained for residents, via Woodhill Dr. See Detour Map.
Other traffic pattern changes include Horning Rd., which will be closed between Theatre Dr. and Loop Road; Theatre Drive will be open with access onto the relocated Horning Rd. Driveway access will be maintained on Horning Rd. with an access point near the Loop Road intersection.
Questions about the East Main Street project can be directed to Jon Giaquinto in the City Engineering Division at Jon.Giaquinto@KentOhio.gov or 330-678-8106. You can also send your email address to Giaquinto if you would like to receive email updates.
Dec. 15, 2025
East Main Street Project – Kent Seeking Public Comments for Midway Drive Sidewalk Extension
The City of Kent and Kent State University propose to construct approximately 225 feet of additional sidewalk on the east side of Midway Drive between Alumni Drive and Theatre Drive as part of the East Main Street Project. This additional sidewalk will increase pedestrian safety by completing a missing connection between two nearby sidewalks on what is expected to be a busy pedestrian route. In addition to the new sidewalk, concrete curb, ADA ramps, storm sewer, and pavement resurfacing will be included. Follow this LINK to view a map of the proposed improvements. The public is invited to submit comments on this proposed sidewalk extension. A 30-day comment period will begin December 15, 2025, and last through January 14, 2026. Comments received during this period will be compiled and addressed. Any comments should be sent to Jon Giaquinto in the City of Kent Engineering Division at 330-678-8106 or by email at Jon.Giaquinto@KentOhio.gov. Comments may also be sent to Jeff Bittenbender in the Kent State University, Office of the University Architect at jbittenb@kent.edu.